Skip to content
Sunday 9 August 2026London --:--Frankfurt --:--Zurich --:--
NewslettersSearchEN · DE
MorningWire

European business, markets and politics

FTSE 100
10,901.09
+0.31%
DAX
26,319.45
+0.69%
CAC 40
8,714.93
+0.17%
STOXX 50
6,523.86
+0.33%
  • Europe
  • Markets
  • Business
  • Economy
  • Technology
  • Politics
  • Opinion
More
GermanyFranceBankingAIEnergyFintechPropertyCapital Markets
  • Germany
  • France
  • Europe
  • Markets
  • Business
  • Economy
  • Technology
  • Politics
  • Opinion
  • DE
Friday 28 October 2022 9:37 am  |  Updated:  Friday 28 October 2022 11:36 am

Centrica reopens Rough storage site at reduced capacity in supply security bid

By: Nicholas Earl

Add as a preferred source on Google

The UK’s largest gas storage site has been reopened by British Gas owner Centrica in a bid to boost supply security this winter.

Centrica revealed this morning the Rough facility off the coast of Yorkshire is back online at reduced capacity, following engineering upgrades and commissioning.

The energy firm has made its first injection of gas into the site in over five years and can now store up to 30bn cubic feet (bcf) of gas this coming winter.

This is the equivalent of nine LNG tankers, enough to potentially power one million homes.

Even though it is only operating 20 per cent of previous capacity, the site will boost the UK’s storage volumes by 50 per cent,

However, it will not increases the days of storage available in the UK – which remains at just nine days.

This is well below European counterparts such as Germany (89 days), France (103 days) and the Netherlands (123 days).

Nevertheless, Centrica hope the flexibility of Rough allows cheaper gas to be stored ready for winter, helping to reduce or stabilise costs for UK energy consumers.

Rough could also balance the UK’s gas market, injecting gas into the facility when prices are low and putting that gas back into the UK’s gas network when demand is higher.

Read more

Burnham to approve North Sea oil and gas drilling in policy blitz

North Sea oil terminal with storage tanks and docking facilities under a clear sky, highlighting energy infrastructure.

Rough storage site finally revived

Centrica first closed the site five years ago after the Government refused to subsidise repairs to the North Sea facility.

Kwasi Kwarteng then opened talks with the FTSE 100 company earlier this year – when he was Business Secretary – with the UK pushing to boost its supply security following Russia’s war on Ukraine.

The National Grid’s latest winter outlook still warns of the possibility of blackouts in a worst-case scenario of freezing winter weather and insufficient supplies being available from Europe.

Centrica’s long-term aim is to turn the Rough gas field into the largest long duration energy storage facility in Europe, capable of storing both natural gas and hydrogen.

Centrica’s chief executive Chris O’Shea, said “I’m delighted that we have managed to return Rough to storage operations for this winter following a substantial investment in engineering modifications.

“Our long-term aim remains to turn the Rough field into the world’s biggest methane and hydrogen storage facility, bolstering the UK’s energy security, delivering a net zero electricity system by 2035, decarbonising the UK’s industrial clusters, such as the Humber region by 2040, and helping the UK economy by returning to being a net exporter of energy.

“In the short term we think Rough can help our energy system by storing natural gas when there is a surplus and producing this gas when the country needs it during cold snaps and peak demand. Rough is not a silver bullet for energy security, but it is a key part of a range of steps which can be taken to help the UK this winter.”

Business and Energy Secretary Grant Shapps added: “While Britain already has secure and diverse energy supplies, this new government will leave no stone unturned when it comes to bolstering our energy security.”

“The reopening of the Rough gas storage facility ahead of the winter will further strengthen the UK’s energy resilience and make us less susceptible to Putin’s manipulation of global gas supplies.”

Read more

Sizewell B granted 20-year life extension

Sizewell B nuclear power station in Norfolk with clear skies and surrounding landscape, highlighting energy infrastructure.

Share this article

  • Facebook
  • X
  • LinkedIn
  • WhatsApp
  • Email

Similarly tagged content:

Sections

  • News

Categories

  • Business

Related Topics

  • Energy
  • gas crisis

Trending Articles

  • Thames Water faces fresh threat to survival after pensions regulation breach

  • PwC’s Embankment HQ to get major makeover ahead of Canary Wharf move

  • Family feud: London estate agent Winkworth sues chair over plot with wife to oust son from board

  • As it happened: Stocks rise despite new tensions in Strait of Hormuz; Oil price climbs

  • A tribute to wine legend Matthew Jukes by his friend Libby Brodie

More from Morning Wire

  • Burnham to approve North Sea oil and gas drilling in policy blitz

    Politics
    North Sea oil terminal with storage tanks and docking facilities under a clear sky, highlighting energy infrastructure.
  • Sizewell B granted 20-year life extension

    Energy
    Sizewell B nuclear power station in Norfolk with clear skies and surrounding landscape, highlighting energy infrastructure.
  • Europe has made a ‘major mistake’ on slow electrification, IEA chief warns 

    Energy
    UK industrial electricity prices are the highest in the G7 and 46 per cent above the average of the International Energy Agency.
  • Grid operator issues fresh heatwave warning over power supplies

    Energy
    Air conditioning vents in a grid pattern, illustrating cooling solutions during a heatwave
  • Energy minister says AI must ‘bring down bills’ as data centres squeeze the grid

    Tech
    National Grid has raised billions from investors for the energy transition
  • BP eyes finalising sale of solar arm to Kuwait-backed wealth fund

    Energy
    British Petroleum BP forecourt with fuel pumps and company signage visible in a business setting, highlighting energy serv...
  • Energy operator ‘flying blind’ as net zero push threatens hiked bills and blackouts

    Energy
    Energy prices are high due to a range of factors including volatile gas prices and high net zero levies.
  • Grid delays force Starmer-backed AI data centre to seek alternative power

    Tech
    Sir Keir Starmer's government has prioritised investment data centres as a major pillar of its plans to boost economic growth.
MorningWire

Independent European business, markets and political news for decision-makers.

Morning Briefing

Europe

  • Germany
  • France
  • Europe
  • UK & Ireland

Business

  • Markets
  • Banking
  • Technology
  • Energy
  • Property
  • Fintech

Editorial

  • Opinion
  • Editorial Policy
  • Corrections
  • Contact

Company

  • About Morning Wire
  • Privacy Policy
  • Terms of Use
  • Cookie Policy
© 2026 Morning Wire Ltd · Published by Morning Wire Media, Bahnhofstrasse 65, 8001 Zürich, Switzerland
Privacy · Terms · Cookies · Facebook