Skip to content
Tuesday 1 September 2026London --:--Frankfurt --:--Zurich --:--
NewslettersSearchEN · DE · FR
MorningWire

European business, markets and politics

FTSE 100
10,789.28
-0.32%
DAX
25,970.11
-1.10%
CAC 40
8,301.85
-0.39%
STOXX 50
6,368.98
-0.80%
  • Europe
  • Markets
  • Business
  • Economy
  • Regulation
  • Politics
  • Opinion
More
GermanyFranceEU InstitutionsCompetitionPublic AffairsBankingTechnologyEnergy
  • Germany
  • France
  • Europe
  • Markets
  • Business
  • Economy
  • Regulation
  • Politics
  • Opinion
  • DE
Monday 25 June 2018 3:49 pm

Take a look at the new London Overground trains with Wi-Fi and USB charging points finally being introduced from November

By: Rebecca Smith

Add as a preferred source on Google

The new London Overground walk-through trains have been unveiled by Transport for London (TfL) and feature Wi-Fi and USB charging points, as well as air conditioning.

They will finally be rolled out this year – after setbacks on the electrification work across the Gospel Oak to Barking route they will be introduced on.

The first of the new 54 trains designed and built by Bombardier Transport in Derby will carry almost 700 people per train. Initially, they will be rolled out between Gospel Oak and Barking to double capacity and replace older trains on West Anglia routes.

Read more: Bombardier could contest loss of £1.5bn contract for Piccadilly Line trains

TfL said the new trains will have "intelligent lighting and temperature control" for more comfortable journeys, along with digital information screens to provide customers with better real-time travel information.

Here's how they look:

 

(Click or tap on the images to see them in full screen)

 

Delays taking rollout off track

The new trains will now be tested on the new infrastructure on the Gospel Oak to Barking route which has been electrified, over the summer. The plan is for the first trains to enter passenger service on the Gospel Oak to Barking route by November – months later than first planned.

The cost of the £130m electrification project climbed to £172m after delays due to incorrect design and late delivery of materials.

Work on the upgrade originally began in June 2016, with TfL originally planning for electrification of the line to finish by the beginning of last July, but it was revealed that work had not been finished in time, with more closures needed.

In May, it was then said the rollout of trains would be pushed back to the summer after delays with the supplier for further software development.

Drivers will now undergo thorough training over the summer before the first train enters passenger service.

Jonathan Fox, TfL’s director of rail and sponsored services, said:

Our new state-of-the-art British built London Overground trains will be an exciting addition to London’s transport network and help boost capacity on some of the most busy and popular lines.

We are very keen to see them introduced into service as soon as possible so our patient customers can benefit from the fully air-conditioned, walk-through trains with handy USB charging points and real-time passenger information screens.

Over the summer, the new trains will undergo final rigorous testing and drivers will complete extensive training. We are now planning for the first trains to enter passenger service on the Gospel Oak to Barking route by November.

Read more: Roll-out of electric trains along Gospel Oak to Barking line delayed

 

Share this article

  • Facebook
  • X
  • LinkedIn
  • WhatsApp
  • Email

Similarly tagged content:

Sections

  • News

Categories

  • Business
  • Transport & Infrastructure

Trending Articles

  • Vodafone and Deliveroo look to patch up Reform ties after Yusuf prison threats

  • Jaguar reveals the Type 01’s screen-free interior

  • Trio of firms poised to quit London Stock Exchange as exodus gathers pace

  • As it happened: FTSE 100 slides as bound rout deepens; Oil jumps as Trump vows more strikes on Iran

  • Easyjet’s over-60s recruitment push is economically necessary

More from Morning Wire

  • No air conditioning on the Tube? Blame Sadiq Khan

    Opinion
    Crowded London Underground platform during summer heat wave, passengers fanning themselves to stay cool
  • Three ways Andy Burnham can avoid Keir Starmer’s mistakes

    Opinion
    Andy Burnham, Mayor of Greater Manchester, speaking at an event
  • TfL greenlights Wayve’s autonomous vehicles in the City

    Tech
    Wayve autonomous vehicle navigating a busy London street with iconic cityscape in the background
  • Let them build homes near stations, but let them be beautiful too

    Opinion
    Two town planners examining a London monorail concept model with buildings and a proposed elevated train line.
  • Which is the smelliest Tube line?

    Opinion
    Passenger wearing a blue surgical mask and coat on a London Underground train.
  • I’m 60, please don’t give me a Freedom Pass

    Opinion
    Close-up of a blue Oyster card against a white background, highlighting its role in public transportation payment systems.
  • A global tram renaissance is underway. Why isn’t London jumping on board?

    Opinion
    London tram 1925 with Last Tram Week sign in front of the Houses of Parliament and Big Ben, 1952.
  • Andy Burnham should show London he cares by funding this one transport project

    Opinion
    Andy Burnham, Mayor of Greater Manchester, standing outside 10 Downing Street in a suit and tie.
MorningWire

Independent European business, markets and political news for decision-makers.

Morning Briefing

Europe

  • Germany
  • France
  • EU Institutions
  • Europe

Business

  • Markets
  • Business
  • Economy
  • Regulation
  • Competition
  • Public Affairs

Editorial

  • Opinion
  • Editorial Policy
  • Corrections
  • Contact

Company

  • About Morning Wire
  • Privacy Policy
  • Terms of Use
  • Cookie Policy
© 2026 Morning Wire Ltd · Published by Morning Wire Media, Bahnhofstrasse 65, 8001 Zürich, Switzerland
Privacy · Terms · Cookies · Facebook